Frequently Asked Questions

At Tent Now, we've spent 30 years answering every technical question about industrial storage structures. We've compiled the most common questions here — with clear expert answers reflecting our deep knowledge of UAE regulations, structural engineering standards, and operational requirements.

Q:How quickly can you deploy a storage tent in the UAE?

Standard clear span structures are operational within 3–7 days depending on size. For urgent requirements, we offer 72-hour emergency deployment for pre-engineered configurations. All permit processing runs simultaneously to avoid delays.

Q:What are the cost savings of a storage tent versus a permanent warehouse?

Industry data consistently shows 50–70% cost savings on total project costs including construction time, materials, labour, and permitting. With Dubai permanent warehouse rents up 33% in 2024 and construction timelines of 6–18 months, storage tents offer a dramatically faster and more cost-effective solution for most applications.

Q:What is the difference between clear span, frame, and industrial tents?

Clear span tents have no interior support columns — ideal for forklift operations and maximum usable space, available 3m to 50m+ wide. Frame tents install on any hard surface without ground penetration — ideal for developed sites like free zones and ports. Industrial tents are configured for specialist applications including cold storage, oil & gas, and labor accommodation with specific safety specifications.

Q:What permits are required for storage tents in the UAE?

Dubai Municipality requires permits under Article 13, with fines up to AED 10,000 for unauthorized structures. Civil Defence approval is required for occupied structures. Abu Dhabi DMT permits apply in the capital. Free zone installations have separate authority approvals. Our team handles all permit applications, structural drawings, and safety certifications at no additional charge.

Q:Can storage tents withstand UAE summer temperatures and sandstorms?

Yes. Our structures use 850 gsm PVC-coated polyester fabric with UV stabilisers rated for 15–20 year service life under UAE conditions. For temperature-sensitive applications, insulated panel systems maintain controlled internal temperatures in 45°C+ summer conditions. Frames are wind-rated to 100+ km/h for sandstorm resistance.

Q:Can you build a tent that meets UAE labor accommodation standards?

Yes. UAE labor accommodation regulations require minimum 3 sqm per worker, proper ventilation, air conditioning, and fire safety provisions. Our labor accommodation tents are engineered to these standards with integrated HVAC systems, electrical distribution, and Civil Defence-approved fire safety specifications. We handle all regulatory documentation.

Still Have Technical Questions?

Our senior engineers are ready to discuss your specific requirements, site conditions, and compliance needs. Call or WhatsApp for immediate technical support.